How to begin repair works associated with the apartment?

The first stage of the repair of old apartments is typically the destruction and taking out first of all from the dilapidated walls and partition wall space, removing the wall and ceiling coating. This stage is usually one of the most “dirty” levels in the repair.

1 more one of the most essential and “dusty” functions is the window block replacement. It is necessary to do this first of all because dirt and dust particles will be unallowable in the course of following stages and it is forbidden at all to be able to open windows during painting and picture works (large falls of the heat and moisture are unallowable). After mounting windows and windowsills it is required to pack all of them immediately in polyethylene film and in order to cover windowsills in addition with the fiberboard (in order to avoid scratches).

These phase is wiring. Electrical wiring can be installed in walls or even along the floor. Wiring is produced inside the pipes to ensure power safety and enhance reliability. The pipe protects wiring through external damages plus allows to substitute the wire entirely without breaking wall space and floor just by inserting the brand new wire instead associated with the old one.

House Painting employs the wiring. The frequent mistake during the simultaneous executing of such functions occurs when employees forget to lay out among the cabling and house artists have already covered and smoothed out the wall. As a result, additional works are necessary to seal chases on the finished wall. Typically the places of typically the feed switch plus wall outlet location and the number must be thought-out within advance. The plan of power wiring is usually included into the design project.

Later on the system must be willing to service in situation of failures. Within addition to typically the wirings, the product wire and the TV SET cable are laid out. The power wire should not be laid away near the mobile phone and antenna cabling to avoid noises pickup and interference. The most peculiar instant is laying out the TV wire. In order in order to make two (or three) TV makes its presence felt the apartment the 2nd cable is often simply “firmly soldered” in parallel, therefore the cable opposition is lowered. Because a result, typically the display quality is damaged, many programs aren’t be received plus etc. In buy to avoid these kinds of situation it is necessary to invite a specialist together with special equipment. This individual will gauge the sign level of the each TV-feeder plus install TV-amplifiers or even TV-filters.

Painting is the most long-term process, that is why it is carried out simultaneously in just about all premises, if it is possible. Delays are associated with the technological innovation. Each applied layer of the plastsorter (or filling inside finishing) must dried out completely prior to the function will continue.

Functions in sanitary arrangements and the kitchen area begin simultaneously together with house painting. It is best to fulfill so-called “dirty” works inside the first spot and simultaneously. Within accordance with the program of the sanitary technician location welded, wall chasing and pipe run are conducted. Steam rad admissions are prepared, taps and mounting brackets are mounted, yet radiators aren’t installed.

Then works in sanitary arrangements are usually conducted in line with the plan. The bath will be mounted, then wall space are smoothed out and the tile is laid on walls. The next stage is building ceiling and installing tiles on the floor. And at last other sanitary devices, mixers and accessories are installed.

After wiring, unit installation of rosette plates and terminal bins the voltage will be checked in all point. Ends of electrical wiring are insulated plus laid out directly into rosette plates. Sockets and breakers aren’t installed during this stage in buy to save their particular surface appearance. Typically the finish puttying associated with walls is conducted simultaneously. The technologically exact control of drying of the layer of the plastsorter (filling) is transported out by drymeter. It is a new special instrument that will measures moisture associated with the material.

The following stage is typically the process of fill. Load could be made along with different materials – from usual masonry cement-sand mixture to self-aligning floors. Typically the advantage of the simple mixture is usually its cheapness, the particular disadvantage is that will such mixture is much harder in-line at the stage and the last dry time associated with such fill is 40 days, only then the subsequent stage of typically the use floor could be conducted, we. e. the time is usually too long. Self-leveling self-aligning floors are much more expensive, but more technological. Aligning occurs almost “automatically” i. e. liquid solution of mixture is poured out, then it works and you get the horizontal area. The final dry out time is two weeks i. e. you might have significant time overall economy. Mobile detailing unit in Raleigh, North Carolina ” is set up into the fill. If the so-called “wet processes” are inapplicable the technology regarding the dry aiming (the fill technology) is used facets for floors with adjustable floor battens are mounted.

Following fill door containers and door are usually installed. Installation of doorways must take into the account width of future flooring. After installation the doorway can be used off its hinges and removed right up until the end associated with repair or jam-packed into polyethylene film to protect from damages. Simultaneously ceiling can be painted and the tile can be laid for the reason that premises where it was planned. The floor tile must be laid on the absolutely dry out overlay.

Finishing of the floor increasing depends on typically the planned covering. Inside most cases (if finish covering is not the tile) fill is covered by simply bitumen mastic plus plywood sheets are usually laid. They usually are fixed to the ground by self-tapping screws. One plywood page is fixed by simply 30-50 self-tapping screws to provide the particular close fixing of plywood and long lasting service of the floor without squeak plus bulging. The particle board gives the extra heat- and traditional insulation. After increasing of the particle board is finished, wallpaper regarding painting can end up being pasted on surfaces.

In premises exactly where finish covering associated with the floor will be laminated flooring or parquet hoard, the ordinary wallpapers are pasted (not for painting) in the 1st place. Then the particular flooring is installed.

If finish addressing in the floor is usually the block parquet, the parquet is laid in the first place, then it is scraped and covered simply by one layer associated with lacquer. After this the ordinary wall-papers are pasted and the parquet is have the rest levels of lacquer (depending around the quality associated with the parquet plus lacquer). The mentioned consequence is associated only with this kind of scrambling process any time the great quantity of dust is created. Despite typically the fact that good floor grinders are equipped with typically the vacuum cleaner, typically the sufficient amount regarding dust is brought on on surrounding subject matter including walls. Dust particles is very acerbic and is poorly washed off. That will is why so as not to damage wallpapers, they are pasted after scrambling and in order the parquet do not absorb the excess moisture it is usually covered by the main one layer of ename before wallpaper pasting.

After this typically the main works could be considered in order to be finished. It is left simply to install the plinths, decorative elements, breakers and sockets, drape holders, to suspend doors, plant-bands and others.

To conclude this is necessary to be able to note that typically the sequence of functions was listed in general and may change based on the certain situation – the number of rooms in premise, your current resources, peculiarities regarding the construction of the multilevel premises. It is based on good sense in addition to every person able to analysis can individually create such the sequence.